Why we built StitchLogic
We built StitchLogic because factories find out too late. Everything you need to see a delay coming is already on your floor every day — but nobody has the half hour to work it out, so the problem is found only when it is too big to fix.
We have spent years on garment factory floors. Not in an office reading reports. On the floor, in the evening, when the day’s output is counted.
In every factory, three people already know what is happening.
- The supervisor knows what his line did today.
- The merchant knows what he promised the buyer.
- The register has yesterday’s numbers.
Why nobody adds it up
A factory can be running 150 colours at the same time.
- Every colour has its own delivery date.
- Every colour needs the same sum. Will it be ready?
- Done by hand, that is half an hour of work.
- Nobody has half an hour. So it does not get done.
A delay is small for a long time
- Two hundred pieces behind in week one looks normal.
- Nobody counts it, so it grows quietly.
- By the time you can see it, you cannot sew it out.
- What is left then is overtime, air freight, or a discount.
What we saw on the floor
This is not a technology problem. It is a time problem. So we built the half hour.
- Owners do not want more reports. They want to know what to fix today. A screen with 15 numbers moves the work. It does not do the work.
- Nobody uses a computer on the floor. Everybody has a phone. If it does not work on a phone, it will not be used.
- The floor already reports. Every night someone asks in a group — aaj kitna hua — and someone answers. So entering output has to be that easy.
- Most people on the floor did not go far in school, and do not read much English. So it is colours, taps and short words. Not forms and menus.
What it does
- Your supervisor enters the day’s output on his phone. Under a minute per line, standing where the work happened.
- StitchLogic does the sums every day — every order, every colour, against every delivery date.
- You get the two orders that need you today. Not a list of 150.
You do not need more reports. You need to know sooner.
Try this tomorrow. Pick one order going out next month. Using only what your factory already wrote down, work out whether it will be ready in time. Note how long it takes you. Now multiply that by every colour you are running. That is the problem we removed. See it done for all of them.
Common questions
Why do garment factories find out about a delay so late?
Because nobody does the sum every day. The delay is small at first and looks normal. By the time it is big enough to see, the only options left are overtime, air freight or a discount.
Do I have to change how my factory works?
No. Your team keeps working the same way. The one change is that the day’s output is typed into a phone instead of a register.
Will my supervisors be able to use it?
If they can send a WhatsApp message, yes. They tap the line, tap the colour, type the pieces. That is the whole job.
Can I use it in Hindi?
Yes. You can ask it questions in Hindi or English.
Do I have to stop using what I use now?
No. StitchLogic sits on top of whatever you already have, and everything comes out in Excel when you need it.
What does it cost?
There is a free plan with no expiry. Every new account gets three months of everything free, with no card. After that it is ₹60,000 a year for the whole company — any number of users, lines and factories.